Location
London
Client
London Borough of Newham
Facility
Extension to existing school
No. of Modules
56
Time on Site
52 weeks

Project
Summary
View Project Gallery
The project’s focus was to expand the school from nine forms of entry to eleven, and McAvoy was appointed due to its reputation for delivering high-quality modular solutions to the education sector. Works included creating a three-storey Performing Arts wing, with a dance and drama suite, attached to the existing school, as well as teaching and ancillary spaces.
Scope of works also included an outside performance landscape, complete with a stage, reconstituted stone step, amphitheatre, green spaces, two canopies, and one covered walkway to the existing building.
Traditional elements such as the dance hall integrate seamlessly with the modular elements of the build, demonstrating the adaptiveness of the McAvoy solution which provides schools with the freedom to choose a hybrid approach where needed to meet exact requirements and build specifications.
View Project Gallery
Hear from
Lister Community College