McAvoy has been appointed by Caerphilly County Borough Council to deliver a bespoke single-storey Wellbeing Centre and Multi-Use Games Area (MUGA) for Islwyn High School, enhancing both student support services and wider community recreation.

Client

Caerphilly County Borough Council

Location

Wales

Facility

Wellbeing Centre & MUGA Pitch

Sector

Education

Building Size

119m²

Installation to Completion

10 Weeks
Islwyn High School Wellbeing Centre

Project
Summary

View Project Gallery

McAvoy has been appointed by Caerphilly County Borough Council to deliver a bespoke single-storey Wellbeing Centre and Multi-Use Games Area (MUGA) for Islwyn High School,
enhancing both student support services and wider community recreation.

View Project Gallery

Facilities

The Wellbeing Centre, procured through a competitive tender via the SEWSCAP framework, will provide students with a dedicated space away from the main school building. This includes an open relaxation and group work area with kitchenette, three small multi-use intervention rooms, storage, and an accessible toilet.

Externally, a carefully coordinated cladding design, featuring white panels with three-tone green highlights mirroring the existing school aesthetic and offering architectural continuity.

Social value & community impact

This project delivers meaningful social value through enhanced support services, educational engagement, and inclusive recreational provision. The Wellbeing
Centre accommodates students and visiting external agencies such as social services and police, providing flexible, purpose-built spaces for early intervention and multi-agency collaboration. Adjacent to the centre, the Multi-Use Games Area (MUGA) will be shared by the school and residents, remaining open outside of school hours to promote physical activity and community wellbeing. As part of the project, McAvoy also delivered construction seminars to pupils undertaking GCSEs in the subject and installed a shed base free of charge, supporting practical learning and inspiring the next generation of tradespeople.

The offsite approach

Offsite was chosen to minimise disruption to the live school environment with the installation taking only one day. Modules were delivered to a high level of completion, including all internal fit-out and M&E services, with full integration into the school’s fire, data, and security systems. McAvoy also carried out enabling
works, including level adjustments, service connections, new footpaths, fencing, and landscaping.

Project challenges

The project presented challenges due to its location on a former colliery site, requiring extensive ground investigations and a specialist foundation design
incorporating ground beams. A sustainable drainage system (SuDS) has been integrated into both the building and MUGA, designed to manage a 1-in-100-
year storm event with an additional 40% climate change allowance. This includes a detention basin, permeable drainage solutions, and soft landscaping features.

Islwyn High School MUGA pitch

Hear from
Caerphilly County Borough Council

Speech Mark

During the construction works at Islwyn High School, the project was delivered in a professional and well-managed manner. The quality of the works was good, and health and safety standards were maintained throughout. Notably, there were no complaints from the school or members of the public during the construction period, which is particularly positive given the live school environment.

James Pizey, Project Manager, Caerphilly County Borough Council