Royal Ulster Agricultural Society

Following relocation from the Kings Hall, Belfast, Royal Agricultural Society required a Grade A office space to accommodate administration staff. A long term hire solution enabled a design to deliver a brand new bespoke building matching all the standards expected from a permanent building.

Location

Belfast

Client

Royal Ulster Agricultural Society

Facility

Grade A Office

Sector

Commercial

Building Size

205m2

Installation to completion

6 Weeks
Royal Ulster Agricultural Society

Project
Summary

View Project Gallery

Following relocation from the Kings Hall, Belfast, Royal Agricultural Society required a Grade A office space to accommodate administration staff. A long term hire solution enabled a design to deliver a brand new bespoke building matching all the standards expected from a permanent building.

View Project Gallery

Customer Perspective

Requirement for a Grade A office space to accommodate their administration staff following the relocation from the Kings Hall, Belfast. From the earliest stages of engagement with Royal Ulster Agricultural Society it was apparent they required a Grade A office facility to help improve staff morale after previous accommodation problems.

Project Summary

After 6 weeks on site the 205m2 modular building reached practical completion with the assembly and installation of 5 steel framed modules onto a prepared site. The high quality modular building is to accommodate all staff  who deal with various events that take place at Balmoral Park and thus internal fit out colour scheme was designed to match corporate branding.

Project Challenges

Due to many different opinions in the client team our expert team incorporated all the design requests to create a Virtual Reality (VR) model. This allowed all the stakeholders to walk around their building before it was even manufactured and installed. The VR model enabled decisions to be  reached much quicker regarding colour’s, fixtures and fittings.

The Offsite Solution

Without the use of our award winning and pioneering VR technology to create a detailed model, including colours, fixtures and fittings, the high level of satisfaction achieved for this Grade A modular building would not have been possible.