Following the completion of a domestics and sewing facility on the same site, McAvoy has delivered a new 1,200m² Central Sterile Services Department (CSSD) for The Queen Elizabeth Hospital King’s Lynn NHS Foundation Trust, providing a modern, purpose-built facility that protects one of the hospital’s most critical clinical support services.

Client

The Queen Elizabeth Hospital King’s Lynn NHS Foundation Trust

Location

Norfolk

Facility

Central Sterile Services Department

Sector

Healthcare

Installation to Completion

36 Weeks

Framework

NHS Shared Business Services
Central Sterile Services Department, Queen Elizabeth Hospital

Project
Summary

View Project Gallery

Delivered as part of the Trust’s Reinforced Autoclaved Aerated Concrete (RAAC) remediation programme, the project relocated the existing CSSD from an ageing RAAC-affected building into a state-of-the-art modular facility. The new department provides an improved working environment for staff, incorporates advanced decontamination technology and ensures the continuity of an essential service that supports thousands of procedures every year.

View Project Gallery

The challenge

The Trust required a rapid replacement for its existing CSSD after RAAC was identified within the original building.

The CSSD is responsible for cleaning, sterilising and supplying surgical instruments used throughout the hospital, processing around 77,000 instrument trays each year. Without this service, operations and many clinical procedures cannot take place, making programme certainty and uninterrupted service continuity essential.

Working within a live hospital environment presented significant logistical challenges. The site was constrained by a single access road, neighbouring buildings were located just 1.5 metres away, and onsite works needed to be carefully coordinated to avoid disrupting day-to-day hospital operations.

The solution

Appointed through the NHS Shared Business Services Framework, McAvoy designed and delivered a two-storey modular CSSD using 38 offsite manufactured modules. Manufactured to 70% completion before delivery, the modules were installed in just one week.

The 1,200m² facility has been purpose-designed to meet the specialist requirements of a modern decontamination service and includes:

  • Autoclave and washrooms
  • Advanced steam boiler and air handling systems
  • Reverse osmosis sterile water treatment
  • Goods-in, storage and dispatch areas
  • Trolley wash facilities
  • Gowning and changing areas
  • Staff welfare facilities
  • Office accommodation
  • Dedicated plant rooms

McAvoy completed the full building fit-out, with specialist decontamination equipment installed by the Trust’s nominated supplier.

Ensuring service continuity

Careful planning and close collaboration were essential throughout the project. Large mechanical equipment was sequenced into position before completion of the plant room floor, while close coordination between McAvoy, specialist suppliers and the Trust ensured the integration of complex building services without affecting live hospital operations.

Building a Sustainable Future

The new CSSD features photovoltaic panels and landscaping works, including the planting of 58 trees to support the Trust’s environmental commitments. The project provides a safe, modern environment designed to support both staff wellbeing and operational performance.

Central Sterile Services Department, Queen Elizabeth Hospital

Hear from
Queen Elizabeth Hospital

Speech Mark

McAvoy delivered a high-quality facility that exceeded our expectations. Their attention to detail and focus on quality were evident at every stage. They demonstrated a strong understanding of working within a live healthcare environment, carefully planning and coordinating works to ensure minimal disruption to hospital operations while maintaining safety at all times.

Their proactive, solution-oriented mindset and ability to respond to challenges with efficiency and professionalism set them apart. McAvoy has proven to be a dependable delivery partner, and I would confidently recommend them for future healthcare projects.

Michael Skinner, Senior Project Manager – Operational Lead (RAAC Projects), The Queen Elizabeth Hospital King’s Lynn NHS Foundation Trust